Maritime Inland Services

Connections

 

Antwerp HTA

Aarau

Antwerp HTA

Basel

Rotterdam RSC

Basel Wolf

Rotterdam Maasvlakte

Basel Wolf

Switzerland

Genova/La Spezia

 

Swiss Split Switzerland

Team
Start of construction at the Brwinów terminal: Hupac invests on the East-West axis

Construction work for a new Hupac transhipment terminal has started in Brwinów near Warsaw. The project aims at enabling an efficient exchange of goods in central and eastern Europe, thus facilitating intermodal transport between China/Russia and Europe by rail.

 

The terminal project extends on an area of nearly 14 hectares. It comprises a storage yard of 42,000 m2, four transhipment tracks with a minimum length of 750 m, and administrative facilities. The containers will be operated by reachstackers.

 

In a second phase, three more transhipment tracks will be added, as well as high performance gantry cranes. The maximum capacity of the facility is limited to 180,000 intermodal units per year.

 

After the completion of the construction works, the terminal will offer rail/road transhipment of intermodal loading units as well as additional services such as storage, warehousing and last-mile trucking. Handover to operations is scheduled for Q3 2022.

Get a quote

Contact

Start of construction at the Brwinów terminal: Hupac invests on the East-West axis

Construction work for a new Hupac transhipment terminal has started in Brwinów near Warsaw. The project aims at enabling an efficient exchange of goods in central and eastern Europe, thus facilitating intermodal transport between China/Russia and Europe by rail.

 

The terminal project extends on an area of nearly 14 hectares. It comprises a storage yard of 42,000 m2, four transhipment tracks with a minimum length of 750 m, and administrative facilities. The containers will be operated by reachstackers.

 

In a second phase, three more transhipment tracks will be added, as well as high performance gantry cranes. The maximum capacity of the facility is limited to 180,000 intermodal units per year.

 

After the completion of the construction works, the terminal will offer rail/road transhipment of intermodal loading units as well as additional services such as storage, warehousing and last-mile trucking. Handover to operations is scheduled for Q3 2022.

Customer Service & Operations

Maritime Inland Services
T. +41 58 855 8788

 

 

Antwerpen Verkehr
T. +41 58 855 8788
export.antw@hupac.com

 

 

Rotterdam Verkehr
T. +41 58 855 8788
export.rott@hupac.com

 

 

Italienische Häfen
T. +41 58 855 8788
maritalia@hupac.com