12 August 2017: disruption of the Rhine-Alpine rail freight corridor

The Rhine valley railway has been closed in Rastatt near Karlsruhe on Saturday 12 August 2017. The reason was a drop of the tracks by half a meter, as result of technical problems during the construction of a tunnel below the rails by DB Netze. The disruption of the main European traffic axis is expected to last until 7 October. Diversion and alternative connections offered by the railways are far from enough to cover the demand of rail freight.

 

DB Netze - Streckensperrung Rastatt - Baden-Baden

 

 

Contact

Irmtraut
Tonndorf
Director
Communications & Marketing
Hupac Intermodal SA
Viale R. Manzoni 6
CH-6830 Chiasso
+41 58 8558020
itonndorf@hupac.com

Hupac Intermodal SA
Viale R. Manzoni 6
CH-6830 Chiasso

T. +41 58 8558800
F. +41 58 8558801

Contact us


© Copyright Hupac SA
Page update: 11.09.2017
CreditsSitemap